The vessel can have a level switch installed so that an alarm can be sounded when the vessel is almost full & a flanged bottom so that internal cleaning can be administered
In API Plan 65 arrangements, leakage from the seal faces is collected via a drain port and directed to a liquid-collections system via a vessel equipped with a high-level alarm.